Printed Monarflex now installed

Working with BAM who are the main contractor on Snowhill 3 in Birmingham we have now fitted the printed Monarflex for this project. The Monarflex protects the site operatives, the public and transport from any harm.

http://www.controlledscaffolding.co.uk/blog/2016/08/printed-monarflex-now-installed

Highest temporary structure in Birmingham?

We have successfully assisted BAM Construct UK and HTC at Snowhill 3 in Birmingham with the crane tie by erecting two separate drop lift scaffolds below the slipform at 60m. The structure in total is now reaching a height of 86m and we believe it could qu…

http://www.controlledscaffolding.co.uk/blog/2017/03/highest-temporary-structure-birmingham